Abel Material Partners
Door & Trim Spec Sheet
- Builder
- Community
- Maple Creek
- Plan
- 2310
- Lot
- Prepared by
- Abel · Gainesville, TX
- Quote #
- Revision
- Rev 2
- Date
- — / — / 2026
Door Schedule
| Mark | Location | Size | Style | Core | Hand | Hardware | Unit Price |
|---|---|---|---|---|---|---|---|
| 01 | Front Entry | 3/0 × 8/0 | Fiberglass 2-panel + 2 sidelites | — | LH out | Entry handleset · satin nickel | |
| 02 | Garage → House | 2/8 × 6/8 | Steel flush · 20-min fire-rated | SC | RH in | Passage + deadbolt | |
| 03 | Master Bath | 2/6 × 6/8 | 2-panel shaker (Monroe) | Solid | LH | Privacy | |
| 04 | Bedroom 2 | 2/6 × 6/8 | 2-panel shaker | Hollow | RH | Privacy | |
| 05 | Bedroom 3 | 2/6 × 6/8 | 2-panel shaker | Hollow | LH | Privacy | |
| 06 | Hall Bath | 2/4 × 6/8 | 2-panel shaker | Hollow | RH | Privacy | |
| 07 | Pantry | 2/0 × 6/8 | Half-lite over 1-panel | Solid | LH | Passage | |
| 08 | Laundry | 2/6 × 6/8 | 2-panel shaker | Hollow | RH | Passage | |
| 09 | Master Closet | 2/6 × 6/8 | 2-panel shaker | Hollow | LH | Passage | |
| 10 | Study (pair) | 5/0 × 8/0 | 15-lite French · pair | Solid | — | Ball catch + dummy set |
Trim Schedule
| Area | Base | Casing | Crown | Notes |
|---|---|---|---|---|
| Common areas | 5-1/4" B-series | 3-1/2" C-295 | 8012 built-up | — |
| Bedrooms | 5-1/4" B-series | 3-1/2" C-295 | — | — |
| Study | 5-1/4" B-series | A Colonial 2-1/4" | 8012 | Applied panel-mould wall |
| Mudroom | 5-1/4" B-series | 3-1/2" C-295 | — | Board & batten to 54" |
General notes
- All interior units pre-hung, primed, bored 2-3/8" backset unless noted.
- Garage-to-house unit 20-minute fire-rated per IRC R302.5.1.
- Delivery staged by opening mark; door, trim, and final walks scheduled with the PM.
- Hardware finish satin nickel throughout unless the selection sheet notes otherwise.
Package total
Doors & hardware
Trim & molding
Total
Pricing is shown to the builder on the live document. It's redacted here because this is a public example.